|
|
Welcome on the official web portal of the UNIS company (based in Brno, Czech Republic)
UNIS company is the provider of the implementation of industrial automation, the design and realization of the high investment projects.
The Portfolio of UNIS comprises as well other products and services, exploited in many branches of chemical, pharmaceutical. machinery or aircraft industry.
News
|
24.05.2013 -
Notice
|
|
|
|
Dear Business friends,
let us to advise of you that company UNIS a.s. will have collection holiday at the time from 01st July to 04th July 2013. Working activities will be limited during these days.
Thank you for understanding. |
|
|
14.03.2013 -
Aero Friedrichshafen 2013
|
|
|
|
The UNIS company participated the international exhibition for general aviation Aero 2013 in Friedrichshafen, Germany 24th -27th April 2013.
The company presented its section Mechatronic & Embedded Systems focus on aviation. Thank you for your visit.
|
|
 |
|
|
|
18.02.2013 -
AMPER
|
|
|
|
UNIS company participated from 19th – 22nd March 2013 at 21th international Trade Fair of Electrotechnics and Electronics AMPER, in BVV Brno.
UNIS company there presented Manufacturing Execution System - PHARIS, bringing robust, proved and price-efficient solution covering the manufacturing needs as from the moment of manufacturing order issuing up to the product release and warehousing and Mechatronic systems aimed at develop and produce high quality and state-of-the-art products that are used in critical control applications (aviation and cars technology, power electronics, robotics and automation). |
|
|
15.11.2012 -
Notice
|
|
|
|
Dear Business friends, Let us give you a notice that collection holiday of UNIS a.s. company will go through from 27th to 31st December 2012. Working activities will be limited during these days. Thank you for understanding. Merry Christmas and a prosperous New Year 2013.
|
|
|
14.11.2012 -
Financial dotation of agency TA ČR
|
|
|
|
From 1st January 2012 cooperates UNIS Company with VZLÚ, VUT and PBS, Velká Bíteš on the project: “Complex Affordable Aircraft Engine Electronic Control (CAAEEC)”. The result of the project shall be the design of reliable, fault tolerant control systems for safety critical applications with turbo-prop and turbo-shaft engines. The project is marked with No. TA02010259 and is solved with financial dotation of TA ČR, planned to 31st December 2015.
|
|
|
10.10.2012 -
International investment forum in Sochi
|
|
|
|
The CEO of UNIS, Jiří Kovář, attended the 11th International Investment Forum “Sochi 2012”, which took place from 20th to 23rd September 2012, where he witnessed the signing of an agreement between Aslan Tkhakushinov, president of the Russian Federation’s Adygea region, and Abukar Bekov, CEO of Antey.
This agreement formalises an investment plan for the construction of a state of the art, low environmental impact petrochemical plant in Krasnodar. Antey’s planned investment amounts to 30 billion RUB.
Construction will be carried out in several phases, the end of first part is planned to 2016. When running at full capacity, the plant will provide up to 1,500 jobs and will generate annual tax revenue for the region of more than half a billion roubles. UNIS’s role in the project will be as designer and general contractor.
More.
|
|
|
03.10.2012 -
Erbil International Fair
|
|
|
|
Company UNIS participated on 15th -18th October 2012 „Erbil International Fair“ in Iraq within the frame of Czech stand. There was presented mainly our realization of complete investment units (EPC), design and application of process control in power engineering, chemistry and petrochemicals and implementation of control systems. Thank you for your visiting. |
|
|
29.08.2012 -
Japan Aerospace 2012
|
|
|
|
UNIS participated in the international Japan Aerospace 2012 in Nagoy, Japan, October 9th – 14th , 2012.
UNIS was presented its aviation products: Jet Engine Control Unit (JECU), Electrical Power Distributing Box (EPDB), Fuel Metering Pump Control system (FMPC), Multifunction Avionics Displays, an unique open distributed System of Aviation Modules (SAM). We introduced also process developing works of FADEC control unit. Thank you for your visit. |
|
|
26.07.2012 -
Confirmation of agreement in the Republic of Adygea, Russian Federation
|
|
|
|
A personal meeting was held between Aslan Tkhakushinov, chief representative of the Republic of Adygea, and Abukarov Bekov, managing director of JSC Antey. The meeting addressed details of the construction of an oil refinery for high-grade products in the Takhtamukaysky region of the Republic of Adygea, and resulted in an agreement on government investment in the project.
The meeting was also attended by the Prime Minister of RA, Murata Kumpilov, the Minister of Economic Development and Trade of RA, Mahmud Tlekhas, the Managing Director of JCS Krasnodarekoneft, Valentin Danilec, and the Czech delegation with Jiri Kovar, Managing Director of UNIS, the designer and contractor for the plant.
More.
Krasnodar’s "Krasnodarekoneft" is one of the best known oil refining plants in Russia, and recently celebrated its 100th anniversary. “Nowadays a new approach is required to the new environmental and legislative requirements in the field oil refining. Expansion and modernization of production enable higher oil reprocessing depth. It is estimated that the plant will produce 6 million tonnes of crude oil a year”, said Abukar Bekov.
The total planned investment in JSC ANTEY is in the order of one billion roubles. The plant will be equipped with modern technology causing minimal environmental impact. Construction is planned in several phases:
|
Atmospheric Distillation of crude oil, desulphurization of gasoline, kerosene and diesel (EURO 5), construction of plant infrastructure |
|
Vacuum distillation of atmospheric residue and visbreaking (maximization of VGO production) |
|
VGO hydrocracking (maximization of diesel production) |
|
Hydrocracking of vacuum residue, deasphaltization, gasification of residue (to achieve maximal reprocessing depth) |
|
Aromatic complex (production of benzene and paraxylene) |
Implementation of the first phase is expected in 2016, and completion of the remaining phases and the entire project in 2020. “When running at full capacity, the plant will provide up to 2,000 jobs and will generate annual tax revenue for the region of more than half a billion roubles” added Abukar Bekov.
Hide. |
|
|
|
You can see older news in archive:
|
|
|