search

TWO BOILERS FOR WASTE HEAT RECOVERY WITH ADDITIONAL COMBUSTION (TORUŃ, POLAND)

reference detail image
reference detail map
End user:
EDF Polska S.A.
Completed:
2017

2 x HRHWB, 1x heat accumulator

  • 2x 116 MWth, 1x 575 MWth
  • 135/60 °C hot water temperature, 12,000 m3 water volume
  • vertical
  • supplementary firing (70 MWth)

Gas turbine: LM 6000 PF

UNIS ACTIVITIES

Complete delivery of boilers. DH system including BoP, pumping station and heat accumulator.